Kindergarten "Detelina" and Children's Daycare Center "Nezabravka"
Client: Devnya Municipality
Contractor: Infrastructural Construction AD
Date of Contract: August 2, 2019
Date of Act 15: Under construction
Project Description
"Implementation of construction and installation works for the project 'Improvement of energy efficiency in the educational infrastructure in Devnya Municipality - Devnya, buildings of 'Detelina' Kindergarten and 'Nezabravka' Childcare Facility' in two separate positions."
Separate position No. 1 titled 'Improvement of energy efficiency in the building of 'Detelina' Kindergarten.'
Separate position No. 2 titled 'Improvement of energy efficiency in the building of 'Nezabravka' Childcare Facility.'
Construction of Group 1, Category 3
Execution of measures for energy efficiency to ensure suitable and cost-effective municipal educational infrastructure.
The building of 'Detelina' Kindergarten consists of three blocks - A, B, and C, architecturally and functionally interconnected. Block A is a two-story structure with two entrances, housing the following rooms: playroom, two bedrooms, dining room, pouring room, and sanitary facility. Block B consists of a two-story and a one-story part. The two-story part contains rooms similar to those in Block A, while the one-story part serves as a kitchen area. Block C is a two-story structure, including the following rooms: playroom, bedroom, dining room, pouring room, isolation room, speech therapist's room, boiler room, fuel storage, staff room, and sanitary facilities. The following categories of works are planned to be carried out: thermal insulation of walls with thermal blocks and plastering on top of the insulation; replacement of wooden windows with PVC windows; insulation of ceilings beneath the roof with 6cm ER5-R insulation; improvement of the heating installation; installation of solar panels; improvement of the lighting and electrical installation.
The building of 'Nezabravka' Childcare Facility consists of four parts - three two-story structures and one single-story building. The single-story building includes the following rooms: administration, teacher's room, caretaker's room, storage room, medical office, and sanitary facilities. The two two-story buildings include a playroom, sanitary facility, storage room, washroom, and utility room, while the third two-story building is designated for the boiler room and laundry. The following categories of works are planned to be carried out: thermal insulation of walls with 6cm Thermopor ER5-R and application of protective coating; replacement of windows with PVC windows; insulation of ceilings beneath the roof with 6cm ER5-R insulation; improvement of the heating installation; installation of solar panels; improvement of the lighting and electrical installation.