Railway Line Karnobat - Sindel - Varna Ferry
Contracting Authority:
Contracting Authority: National Railway Infrastructure Company (NRIC)
Contractor: Consortium "TBS 2012-2016" - Infrastructure Construction AD
Date of Contract: December 6, 2016
Date of Act 15: December 28, 2016
Project Description
Reconstruction and Electrification of the railway line Dimitrovgrad – Svilengrad, Phase 4.1: Dimitrovgrad – Harmanli. Section No. 1 Dimitrovgrad Station (from km 231+560 to km 234+290); Part: Overhead Contact Line within the territory of Dimitrovgrad goods station. Electrification of Dimitrovgrad goods station.
Construction Group 2, Category 1.
To reinforce the embankment, a retaining wall was constructed, consisting of three sections, with its main part being 3.7m high. In sections where the massif is rocky and the slope is low, drainage ditches with a high board - 1m towards the slope - of the type LPS are installed.
To prevent future landslides and maintain the integrity of the retaining structure, drainage of the embankment was carried out.