{"id":1358,"date":"2022-01-10T19:22:07","date_gmt":"2022-01-10T19:22:07","guid":{"rendered":"https:\/\/infras.bg\/portfolio-item\/chirpan-station-section-orizovo-mihailovo\/"},"modified":"2023-05-22T22:07:49","modified_gmt":"2023-05-22T22:07:49","slug":"chirpan-station-section-orizovo-mihailovo","status":"publish","type":"portfolio","link":"https:\/\/infras.bg\/en\/portfolio-item\/chirpan-station-section-orizovo-mihailovo\/","title":{"rendered":"Chirpan station (section Orizovo &#8211; Mihailovo)"},"content":{"rendered":"\n<p>\n          <strong>Project Description:<\/strong>\n        <\/p>\n\n\n\n<p>\n          <strong>&#8220;Modernization of railway section Orizovo &#8211; Chirpan&#8221; under the project &#8220;Rehabilitation of railway line Plovdiv &#8211; Burgas, Phase 2&#8221;; Section 814-12 Chirpan station from km 59+105,35 (NS12) to km 60+126,60 (NS9) with length 1021m.<\/strong>\n        <\/p>\n\n\n\n<p>Construction Category One.<\/p>\n\n\n\n<ol type=\"I\"><li>Activities for the preparation of projects for the parts &#8220;Railway&#8221;; &#8220;Contact Network&#8221;; &#8220;Signalling and Telecommunication Systems&#8221;; &#8220;Buildings&#8221;; &#8220;Facilities&#8221;<\/li><li>  Activities for the execution of the works on the &#8220;Railway&#8221; part include:<\/li><li>reconstruction of the switch and track development at Chirpan station (4 tracks)<\/li><li>construction of new drainage systems;  <\/li><li>laying of a new substructure &#8211; including reaching the required minimum values of the deformation modulus of the earth base and, if necessary, additional strengthening (reinforcement);<\/li><li>laying of protective layer, geogrids and geotextiles;<\/li><li>overhead structure of rails type 60E1 for main tracks and 49S for secondary tracks, reinforced concrete sleepers and elastic bracing according to TSI requirements;<\/li><li>construction of 2 new platforms and provision of access to the platforms for persons with reduced mobility;<\/li><li>Rehabilitation of the existing pedestrian underpass with access to platform 2;<\/li><\/ol>\n\n\n\n<ol type=\"I\"><li>Activities for the execution of the works on the &#8220;Contact Network&#8221; part<\/li><li>dismantling of overhead lines, including poles and foundations;<\/li><li>construction of new pillars and foundations;<\/li><li>construction of a new overhead line;<\/li><li>sectioning of the overhead line and integration of the motor drives of the disconnectors into the existing remote control panels;<\/li><li>tests for connection to the SCADA telecontrol system in the Central Dispatch Center (CDC) Plovdiv.<\/li><\/ol>\n\n\n\n<ol type=\"I\"><li>Activities for the execution of the works under the part &#8220;Signalling and telecommunication systems<\/li><li>dismantling of existing MRCs;<\/li><li>Rehabilitation of 2 rooms intended for MCC ;<\/li><li>Construction of a duct network in the area of stations and approach sections;<\/li><li>supply and installation of external equipment (SOA, traffic lights, BO, cables) in the area of stations and approach sections;<\/li><li>supply, installation and commissioning of the MCC equipment;<\/li><li>dismantling of temporary signals (temporary control panels);<\/li><li>making heating of the railway. shooters;<\/li><li>making outdoor lighting, including platform lighting;<\/li><li>making of external electrical. power<\/li><\/ol>\n\n\n\n<ul><li>Activities for the execution of the works under the &#8220;Buildings&#8221; part include:<\/li><li>rehabilitation of the existing reception building<\/li><li>demolition of existing buildings &#8211; posts<\/li><\/ul>\n\n\n\n<ul><li>Activities for the execution of the works under the &#8220;Facilities&#8221; part include:<\/li><li>construction of a new reinforced concrete box culvert at km 59+031.30 with clear dimensions of 2.0\/2.0 m, passable and allowing for revision and cleaning of the drainage outlet<\/li><li>works on the culvert on the km &#8211; on the side of the culvert the existing guardwall is removed and in its place a reinforced concrete box is built with a length of 2.6m, clear section dimensions of 1\/1.2m and wall thickness of 0.3m; on the outflow side, a corner retaining wall is to be built but with a developed front cantilever, integrating the end of the culvert into its thickness and creating a guardwall supporting the ballast at the level of the bank.<\/li><li>construction of noise barriers in the station area<\/li><li>construction of safety fences in the station area<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Project Description: &#8220;Modernization of railway section Orizovo &#8211; Chirpan&#8221; under the project &#8220;Rehabilitation of railway line Plovdiv &#8211; Burgas, Phase 2&#8221;; Section 814-12 Chirpan station from<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":1,"featured_media":1045,"menu_order":0,"template":"","meta":[],"portfolio-types":[12],"_links":{"self":[{"href":"https:\/\/infras.bg\/en\/wp-json\/wp\/v2\/portfolio\/1358"}],"collection":[{"href":"https:\/\/infras.bg\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/infras.bg\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/infras.bg\/en\/wp-json\/wp\/v2\/users\/1"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infras.bg\/en\/wp-json\/wp\/v2\/media\/1045"}],"wp:attachment":[{"href":"https:\/\/infras.bg\/en\/wp-json\/wp\/v2\/media?parent=1358"}],"wp:term":[{"taxonomy":"portfolio-types","embeddable":true,"href":"https:\/\/infras.bg\/en\/wp-json\/wp\/v2\/portfolio-types?post=1358"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}