Section Senovo - Prostorno
Contractor: Consortium "RAILWAY 2012-2016" - Vodstroy AD
Executor: Infrastructure Construction AD
Contract Date: October 3, 2016
Act 15 Date: August 24, 2017
Project Description
Mechanized renovation of the railway from km 47+845 to km 55+877 with a length of 8,032m in the section between Senovo and Prostorno, from km 55+943 to km 56+802 with a length of 860m on the 2nd track (current track) at Prostorno Station, from km 56+835 to km 56+842 with a length of 6m (between switches No. 1 and 3), with a total length of the railway of 8,898m, and replacement of 4 switches with R=300m, identified as No. 2, 4, 3, and 1 at Prostorno Station.
Construction of 2nd Group, Category 1
Demolition of existing railway, type 49, using a link-by-link method, complete disassembly and stacking of dismantled railway, type 49, on a designated area or in a storage yard, installation of new rail links with inventory rails type 60E1 and new reinforced concrete sleepers ST-6/or equivalent (1,720 pcs/km), laying of the new railway using the link-by-link method. Mechanized sieving of the ballast prism without an elevator train and mechanized sieving of the ballast prism with an elevator train, including a locomotive. Installation of drainage pipes with a diameter of 300 in the area of Prostorno Station platforms.
Demolition of existing railway, type 49, using a link-by-link method at Prostorno Station, complete disassembly and stacking of dismantled railway, type 49, on a designated area or in a storage yard, installation of new rail links with inventory rails type 60E1 and new reinforced concrete sleepers ST-6/or equivalent (1,720 pcs/km), laying of the new railway using the link-by-link method. Neutralization, first, second, and third leveling. Installation of railway switches with 60E1 on concrete sleepers.
Construction of platform pavements at Prostorno Station between the 1st and 2nd tracks and between the 2nd and 3rd tracks, and installation of visual-tactile warning markings.