Renovation of the Sports Ground at Hristo Botev Primary School, Asparuhovo District, Varna
Execution of construction and installation works on existing buildings, facilities, and adjacent areas for the needs of Varna Municipality under Lot №10 "Execution of construction works for the renovation of the sports ground at Hristo Botev Primary School, Asparuhovo District, Varna, based on Framework Agreement №RD16003432VN/11.02.2016 for specific lots."
Sections Skutare-Orizovo and Straldzha-Tserkovski
Rehabilitation of the railway sections Skutare-Orizovo and Straldzha-Tserkovski, part of the project "Rehabilitation of the railway infrastructure along the Plovdiv – Burgas railway line – Phase 2," under Lot 1: Rehabilitation of the Skutare – Orizovo railway section; funded by the Operational Program "Transport and Transport Infrastructure" (OPTTI) 2014-2020.
Renovation of the Sports Ground at Dobri Chintulov Primary School, Mladost District, Varna
Construction 1st group, 4th category Types and scope of works: Construction and installation works for the dismantling and removal of old playgrounds and the construction of new fields for football, basketball, volleyball, handball, and a modern outdoor fitness area. The playground is equipped with lighting for evening training sessions.
Dimitrovgrad – Svilengrad
Reconstruction and electrification of the Dimitrovgrad – Svilengrad railway line, Phase 4.1: Dimitrovgrad – Harmanli. Section №1 Dimitrovgrad Station (from km 231+560 to km 234+290); Part: Overhead Contact Line within the Dimitrovgrad freight station territory. Electrification of the Dimitrovgrad freight station.
Section Senovo-Prostorno
Mechanized renewal of the railway track from km 47+845 to km 55+877 with a length of 8,032 m in the Senovo-Prostorno section, from km 55+943 to km 56+802 with a length of 860 m on the 2nd track (current track) at Prostorno Station, from km 56+835 to km 56+842 with a length of 6 m (between switches №№ 1 and 3), with a total railway track length of 8,898 m, and replacement of 4 switches with R=300 m (№№ 2, 4, 3, and 1) at Prostorno Station
Building with Administrative Address Varna, Mladost District, Troshevo Residential Complex
For Lot №10: Execution of engineering - design and construction works for a building with administrative address Varna, Mladost District, Troshevo Residential Complex, Block 79, as part of the National Program for Energy Efficiency of Multifamily Residential Buildings (NPEEMRS)
Karnobat - Sindel - Varna Ferry
Railway Line №3 Karnobat - Sindel - Varna Ferry - Reconstruction - Emergency reinforcement of an earth-rock slope from km 62+570 to km 62+700 in the section between Daskotna and Tarnak - Phase I in the area of the Gorna Oryahovitsa Railway Section, Varna Railway Maintenance District
Section Kurilo - Rebrovo
Restoration of the design speed in the section Kurilo - Rebrovo, track № 2 from km 13+294 to km 23+632 with a length of 10,338 m, including adjacent stations: Kurilo Station - TP 2 with a length of 980 m and associated switches № 8, 10, 14, 9, and 3, between switches № 10 and № 14 with a length of 46 m, as well as between switches № 3 and № 9 with a length of 22 m, and Rebrovo Station - TP 2 with a length of 891 m and associated switches № 1 and 2
Striama Station – Klisura Station
Rehabilitation of engineering structures, including tunnels, bridges, and culverts, as well as facilities and devices of the power supply system of the railway infrastructure in the section Striama Station – Klisura Station from km 113+005 to km 115+729 with a length of 2,724 m
Main Gas Pipeline Du1000
Design and execution of major repairs on the Main Gas Pipeline Du1000 and repair and restoration works on underwater crossings of the Main Gas Pipeline Du1000 and transit gas pipelines - T1 Du1200, T-2 (loop) Du1200 at the Dobrichka River in the area of Vrachantsi village, Dobrich Municipality, under the operational area "Valchi Dol"