Interstation Koprivshtitsa - Stryama
"Rehabilitation of the railway, artificial facilities, facilities and devices of the electricity supply system from railway infrastructure in the Koprivshtitsa - Stryama interstation from km 100+525 to km 106+337 with a total length of 5812 m according to III- that railway line"
ODZ "Detelina" and CDG "Nezabravka"
"Performance of construction and installation works under the project "Increasing the energy efficiency of the educational infrastructure in the Municipality of Devnya - the town of Devnya, the buildings of the "Detelina" ODZ and the "Nezabravka" CDG on two separate positions"< /p>
Renovations of a sports field at Hristo Botev Primary School, Asparuhovo district, Varna
Execution of CMP on same. buildings, objects, facilities and adjacent lands for the needs of the municipality of Varna under specific item No. 10 "Performance of SMR during the implementation of reconstructions of a sports field in Hristo Botev Primary School, Asparuhovo district, Varna based on Framework Agreement No.RD16003432ВН/ 11.02.2016 by specific positions
Scutare-Orizovo and Straldzha-Tserkovski sections
Rehabilitation of the railway sections Skutare-Orizovo and Straldzha-Tserkovski, part of the project "Rehabilitation of the railway infrastructure along the railway line Plovdiv - Burgas - Phase 2", under specific item 1: Rehabilitation of the railway section Skutare - Rice; OPTTI (Operational Program "Transport and Transport Infrastructure") 2014-2020
Renovations of a sports field in Dobri Chintulov Primary School, Mladost district, Varna
Construction 1 group 4 category Types and volume of SMP: CMR for dismantling and demolishing old and building new fields for football, basketball, volleyball, handball and a modern outdoor fitness area. The playground is equipped with lighting for evening training.
Dimitrovgrad – Svilengrad
Reconstruction and electrification of the railway line Dimitrovgrad - Svilengrad, Phase 4.1: Dimitrovgrad - Harmanli. Section No. 1 Dimitrovgrad Station (from km. 231+560 to km. 234+290); Part: Overhead Contact Line on the territory of Dimitrovgrad freight station Electrification of Dimitrovgrad freight station
Section Senovo-Storno
Mechanized renewal of the railway from km 47+845 to km 55+877 with a length of 8,032m in the Senovo-Prostorno interstation from km 55+943 to km 56+802 with a length of 860m along the 2nd track (current track) in Prostorno station, from km 56+835 to km 56+842 with a length of 6m (between switches No. 1 and 3), with a total length of the railway 8898m and replacement of 4 switches with R=300m with No. 2, 4, 3 and 1 at Prostorno
stationBuilding with administrative address, city of Varna, district of Mladost, district of Troshevo
for OP No. 10 Implementation of engineering - design and implementation of SMR of a building with administrative address, city of Varna, district of Mladost, district of Troshevo, block 79 in implementation of the National Program for energy efficiency of multi-family residential buildings NPEEMZHS
Karnobat - Sindel - Varna Ferry
Railway line No. 3 Karnobat - Sindel - Varna Feribotna - reconstruction - Emergency strengthening of the earth-rock slope from km 62+570 to km 62+700 in the Daskotna-Tarnak interstation - 1st stage in the area of the Gorna Oryahovitsa railway section, Varna railway station district"
Section Kurilo - Rebrovo
Restoration of the design speed in the Kurilo - Rebrovo interstation, road No. 2 from km 13+294 to km 23+632 with a length of 10,338 M, with adjacent stations: Kurilo station - T.P. 2 with a length of 980 m and adjacent arrows No. 8, 10, 14, 9 and 3, between arrows No. 10 and No. 14 with a length of 46 m, as well as between arrows No. 3 and No. 9 with a length of 22 m and Rebrovo - T station. P 2 with a length of 891 m and adjacent arrows No. 1 and 2
Stryama Station - Klisura Station
Rehabilitation of engineering facilities, incl. tunnels, bridges and culverts, the facilities and devices of the electricity supply system from the railway infrastructure in the section Stryama station - Klisura station from km 113+005 to km 115+729 with a length of 2724m
Main gas pipeline Du1000
Design and implementation of major repairs of the Main gas pipeline Du1000 and repair and restoration works of underwater transitions of the Main gas pipeline Du1000 and transit gas pipelines -T1 Du1200, T-2 /looping/ Du1200 near the river Dobrichka in the land of the village of Vrachantsi, Dobrich municipality, to the exploitation area "Valchi dol"