Viso Polyana – Hitrino interfluve
December 5, 2024
Chirpan station (section Orizovo – Mihailovo)
January 10, 2022
at January 10, 2022
Categories
  • Projects in the "About Us" section
  • DateJanuary 10, 2022

Orizovo Station (section from Orizovo - Mihailovo)

Purchaser: DP "NKŽI"
Executive: DZZD "EURO RAILWAY INFRASTRUCTURE"
Date of the contract: 07.11.2019
Date of Act 15: Under construction
Оризово-главна
1st stage





2nd stage







3rd stage



4th stage




5th stage

6th stage
default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default


7th stage
default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default


8th stage
9th stage
default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default


10th stage
default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default


11th stage
default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default


12th stage
default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default
default
default
default

default

Project description:
“Modernization of railway section Orizovo – Chirpan” under the project “Rehabilitation of railway line Plovdiv – Burgas, Phase 2”; Section 812 Orizovo station from km 42+376,96 (NS2) to km 44+086,06 (KS1) with length 1709m.
Construction Category One.
I. Project preparation activities for the parts “Railway”; “Overhead contact line”; “Signalling and telecommunication systems”; “Buildings”; “Facilities”
II. Activities for the execution of the works on the “Railway” part include:
– reconstruction of the switch and track development of Orizovo station (on 3 tracks) to accommodate the new double track railway;
– construction of new drainage systems;
– laying of a new substructure – including reaching the required minimum values of the deformation modulus of the earth base and, if necessary, additional strengthening (reinforcement);
– laying of protective layer, geogrids and geotextiles;
– overhead structure of rails type 60E1 for main tracks and 49S for secondary tracks, reinforced concrete sleepers and elastic bracing according to TSI requirements;
– construction of 3 new platforms and a new pedestrian overpass (pedestrian crossing);
III. Activities for the execution of the works on the “Contact Network” part
– dismantling of overhead lines, including poles and foundations;
– construction of new pillars and foundations;
– construction of a new overhead line;
– sectioning of the overhead line and integration of the motor drives of the disconnectors into the existing remote control panels;
– tests for connection to the SCADA telecontrol system in the Central Dispatch Center (CDC) Plovdiv.

IV. Activities for the execution of the works under the part “Signalling and telecommunication systems
– dismantling of existing MRCs;
– Rehabilitation of 2 rooms intended for MCC ;
– Construction of a duct network in the area of stations and approach sections;
– supply and installation of external equipment (SOA, traffic lights, BO, cables) in the area of stations and approach sections;
– supply, installation and commissioning of the MCC equipment;
– dismantling of temporary signalling (temporary control panels);
– making heating of the railway. shooters;
– making outdoor lighting, including platform lighting;
– making of external electrical. power

V. Activities for the execution of the Works under the “Buildings” part include:
– the construction of a new reception building;
– Rehabilitation of a technical building for signalling and telecommunications purposes;
– demolition of existing buildings – shop, cantonment, outdoor toilet, water tower and concrete foundation of water crane, posts

VI. Activities for the execution of the works under the “Facilities” part include:
– works on the culvert at km 42+975,12 – construction of a new water intake shaft at the inlet, with a view to the discharge of a ditch from the drainage system;
– construction of a culvert at km 42+975,12 with a length of 16m; 13pcs are provided for its construction. tubular reinforced concrete elements with an internal diameter of 100 cm and a wall thickness of 13 cm; shafts with clear dimensions of 120/140 cm and a wall thickness of 20 cm are installed at the inlet and outlet.
– works on the culvert at km 43+69,40 – widening of the structure on the outflow side with a box frame without bearings and joints.
– construction of the underpass for livestock on km 43+030,50 includes: excavation and cleaning of the construction site; excavation works up to the laid concrete for the execution of the foundation slab at offset 2:1; laying of pipes ∅200 in concrete casing for storm water drainage from the underpass; sub-base concrete – 10cm, class C12/15; formwork and reinforcement works for the base slab; concreting of the slab to the working joint with the wall; formwork and reinforcement of the walls and concreting to the bottom edge roof slab; scaffolding, formwork, reinforcement roof slab and concreting the same; execution of curbs and sidewalks in which pipes are laid for holes 2×8∅110; formwork and reinforcement works for the bottom slab of the ramps; concreting of the slab to the working joint with the wall; formwork and reinforcement of the ramp walls and concreting; waterproofing – double coating with hot bitumen or other smeared waterproofing on walls and sheet waterproofing on roof slab, protection with concrete reinforced with N5-20/20cm mesh; backfill on the sides of the facility in 25cm layers of ballast and compaction of the same; backfill over the track facility;
– construction of noise barriers in the station area
– construction of safety fences in the station area

Related posts

January 10, 2022

Chirpan station (section Orizovo – Mihailovo)


Read more
May 27, 2021

Modernisation of the railway section Orizovo – Mihailovo.


Read more
October 29, 2020

Dragoman Station


Read more