The Vysoka Polyana – Hitrino interchange is located on the ninth main railway line Ruse – Kaspichan.

For restoration of normal operation in the interstation Vysoka Polyana – Hitrino from km 96+030 (start of switch No. 1 at Vysoka Polyana station on the existing mileage), up to km 109+550 on the existing mileage (coinciding with the point of “linking” of the forthcoming repair in the interstation Vysoka Polyana – Hitrino with the repair in Hitrino station, corresponding to km 109+436 of the accepted project by the Employer for Hitrino station), with a length of 13 520 m on the 9th railway line, is planned and executed:

А. On the Iron Road part

  • Design;
  • Delivery of materials;
  • Mechanized renewal of the rail-track grating, including dismantling, dismantling, stacking and removal of the dismantled track, installation, transport and laying of new track with rails type 60 kg/m, sleepers CT-6, baseless elastic fastening SKL-14, ballast prism alignment, strengthening of the track after laying;
  • Mechanized ballast prism screening;
  • Loading of hopper wagons, addlasting and making leveling;
  • Construction of an abandonment-free track;
  • Replacement of 3 pieces of the existing crossover with resilient pavement for Type 60 rail-track grating;
  • Construction of a new platform with a length of 56 m and a new shelter at the Baikovo stop;
  • Reconstruction and extension of 22 culverts;
  • Construction of new ditches type LPS, BC and ECT – 5587 m;
  • Making earth ditches – 9090 m;
  • Cleaning and restoration of drainage structures, banks, re-cutting and shaping of berms and slopes;
  • Grading within the easement;
  • Basic clearing and uprooting of shrubs and trees;

Б. By part Contact network

  • Design;
  • Delivery of materials;
  • Erection of pillar type SBMK 57/11,15 – 325 pcs;
  • Uprighting of pillar MH25/12 – 38 pcs;
  • Erection of pole MA1- 1 pc;
  • Installation of the anchors – 40 pcs;
  • Installation of new gauge frames on the crossings – 6 pcs;
  • Replacement of carrier rope – 15,339 km;
  • Replacement of the contact wire Cu ETP 100mm2 – 15,339 km;
  • A new reverse feeder type AC 185 mm2 shall be withdrawn;
  • Replacement of strings and string terminals with equipotential -15,339 km;
  • Installation of new consoles – 346 pcs;
  • Replacement of three-roll compensators with new gas compensators – 28pcs;
  • An existing long neutral insert is processed into a short one;
  • Replacement of transformer installations with new ones on new poles, installed independently, with new transformers – single-phase, dry-standing with solid insulation.

Expected effect of the construction:

By carrying out the track repair in accordance with the technical standards for maintenance and repair, the security and safety of train movements and their reliability are guaranteed, ensuring:

  • The management of train operations on the railway infrastructure in compliance with safety, reliability and security requirements ensuring reliable operation;
  • Speed conditions to ensure a sustainable timetable of trains and increasing speeds on a book timetable;
  • Traffic capacity allowing efficient use of the railway network;
  • Lowering the cost of ongoing maintenance of the railway and facilities;
  • Improving the parameters of the railway:
  • Ensuring better comfort and security of travel.