Interstation Space - Kaspichan
Client: Consortium "RAILWAY 2012-2016" - Vodstroy 98 AD
Contractor: Infrastructural Construction EAD
Contract Date: 08.09.2016
Act 15 Date: 01.12.2017
Project Description
Mechanized medium repair of railway track with heavy road machinery on sections with a total length of 34,941m between Prostorno and Kaspichan stations on the 9th railway line
Construction, 2nd group, 1st category
The mechanized repair of the section between Prostorno and Kaspichan stations includes:
1. Delivery of ballast for the entire section of railway tracks;
2. Mechanized screening of the ballast prism without an elevator train in sections;
3. First leveling of the railway track in sections;
4. Second leveling of the railway track along the entire length of the section between Prostorno and Kaspichan stations;
5. Excavation for drainage and protective road ditches outside the road area;
6. Leveling of the embankments on both sides of the railway track;
7. During the mechanized repair, passenger transshipment was carried out when train traffic was stopped.